Yahoo Italia Ricerca nel Web

Risultati di ricerca

  1. 9 mag 2024 · U.S. group TerraPower is confident its first Natrium advanced nuclear reactor will be built by 2030 with construction plans and licensing running smoothly, but fuel supply remains a concern, the...

  2. 1 giorno fa · TerraPower has received significant and constant DOE support for its Molten Chloride Fast Reactor (MCFR) project. In 2016, DOE awarded a five-year, $40m cost-share award for continued R&D that resulted in a new public-private MCFR project development partnership including TerraPower, Southern Company, Oak Ridge National Laboratory, the Electric Power Research Institute, and Vanderbilt University.

  3. www.nrc.gov › reactors › new-reactorsNatrium | NRC.gov

    15 mag 2024 · The Natrium design combines features from the previous GEH PRISM and TerraPower Traveling Wave designs. The proposed Natrium reactor is a 345 MWe pool type sodium fast reactor using HALEU metal fuel. For more information, please see the Natrium pre-application documents (NRC Docket 99902100) .

  4. 6 giorni fa · Rendering of TerraPowers Natrium power plant. The U.S. Nuclear Regulatory Commission (NRC) accepted TerraPowers construction permit application for review, marking the first time in more than 40 years that the NRC has docketed this type of application for a commercial non-light water reactor.

  5. 5 giorni fa · Bill Gates-backed TerraPower is planning its first Natirum nuclear power plant in Wyoming. Courtesy TerraPower. The US Nuclear Regulatory Commission (NRC) has accepted TerraPower’s construction permit application for review, marking the first time in more than 40 years that the NRC has docketed this type of application for a commercial non-light water reactor.

  6. 13 mag 2024 · The Dedicated Team of the Natrium Reactor Demonstration Project. May 13, 2024. By: Chris Levesque, TerraPower President and CEO. On behalf of the entire TerraPower team, I extend our deepest gratitude to the engineers at Bechtel and GE Hitachi for their invaluable contribution to the Natrium TM reactor demonstration project.

  7. 14 mag 2024 · Staff Writer May 14, 2024. US-based TerraPower says it is confident its first Natrium advanced reactor will be built by 2030. Construction plans and licensing is proceeding as planned, but fuel supply remains a concern, the company said, according to a Reuters report.